Each project represents a system engineered from scratch, procured from our qualified vendor network, and commissioned to specification.
CPCB-compliant bag filter EPC. Outlet: 12 mg/Nmยณ vs 50 mg/Nmยณ regulatory limit. Commissioned ahead of schedule.
Full ZLD EPC achieving 97% water recovery. Regulatory closure obtained within 30 days of commissioning.
Bulk material handling EPC including structural, mechanical, electrical, and instrumentation. On time delivery.
Melt shop fume control EPC for steel manufacturing. SOโ and particulate removal to regulatory limits.
Pharmaceutical ETP EPC designed to CPCB General Standards. MBR technology for high-quality treated water.
Fly ash silo EPC for a thermal power plant. Includes pneumatic filling, aeration, and level instrumentation.
Download our complete project reference list or submit your requirement for a tailored proposal.